Tailored solutions for the chemical and petrochemical industries.

Engineering
A team of engineers discussing plans over blueprints in an industrial setting.
A team of engineers discussing plans over blueprints in an industrial setting.
  • Project Feasibility Development

  • Front End Engineering

  • Project Drawings Development

A close-up of a scheduling software interface displaying project timelines and tasks.
A close-up of a scheduling software interface displaying project timelines and tasks.
A warehouse filled with organized materials ready for procurement and distribution.
A warehouse filled with organized materials ready for procurement and distribution.
Project Management, Planning & Scheduling
  • Planning

  • Scheduling

  • Key Indicators Dashboard

  • Material and Services Quote

  • Material Certificates & Vendor Qualification

  • Logistics

Procurement

Engineering services

Project Feasibility

Design Summary

  • Overview of the proposed engineering solution

  • Key design parameters, layout concepts, and system architecture

  • Alignment with client objectives, codes, and standards

  • Preliminary drawings or schematics (if available)

Economics

  • Capital cost estimates and operating expenses

  • ROI, NPV, IRR, and payback period analysis

  • Budget sensitivity and contingency planning

  • Funding sources and financial risk assessment

Geopolitical

  • Regional stability and regulatory landscape

  • Trade restrictions, tariffs, and import/export considerations

  • Labor laws, taxation, and government incentives

  • Political risk factors affecting execution or supply chain

Environmental

  • Impact assessments (air, water, soil, emissions)

  • Permitting requirements and regulatory compliance

  • Waste management and sustainability measures

  • Mitigation strategies for environmental risks

Historical

  • Site history and legacy infrastructure

  • Past incidents, maintenance records, or project outcomes

  • Lessons learned from previous developments

  • Cultural or heritage considerations (if applicable)

Social

  • Community engagement and stakeholder impact

  • Workforce availability and local skillsets

  • Health, safety, and social responsibility metrics

  • Public perception and potential opposition

Process Flow Diagrams (PFDs)

High-level schematics outlining major process units, flow directions, and interconnections. PFDs define the backbone of the process and guide downstream design.

Piping & Instrumentation Diagrams (P&IDs)

Detailed diagrams showing piping, valves, control loops, instrumentation, and safety systems. P&IDs are essential for operations, maintenance, and HAZOP reviews.

Plant Layouts

Top-down views of equipment placement, pipe routings, access paths, and safety zones. These layouts support constructability, space optimization, and compliance.

Equipment & Instrument Specifications

Datasheets and technical specs for major mechanical equipment, pressure vessels, pumps, compressors, and instrumentation. These guide procurement and vendor selection.

We offer full-spectrum drawing development using industry-standard platforms:

AutoCAD Services

  • 2D mechanical and piping layouts

  • P&IDs, isometrics, and spool drawings

  • Structural framing plans and foundation details

  • Drawing standardization and title block branding

  • Redline incorporation and as-built updates

SolidWorks Services

  • 3D modeling of mechanical components and assemblies

  • Exploded views and fabrication-ready part drawings

  • Tolerance analysis and interference checks

  • BOM generation and revision control

  • Sheet metal, weldment, and piping module support

Front End Engineering
Project Drawings Development

Project Management, Planning & Scheduling

Structured Execution. Measurable Results.

At AK Engineering & Contracting, we deliver project management solutions that drive efficiency, safety, and stakeholder value. From concept to commissioning, our planning and scheduling services ensure your projects stay on track, on budget, and aligned with operational goals.

What We Offer

Project Management

  • Scope definition, work breakdown structures (WBS), and deliverable tracking

  • Cost control, budgeting, and earned value analysis (EVA)

  • Risk management and mitigation planning

  • Stakeholder coordination and reporting

Planning & Scheduling

  • Primavera P6 and MS Project schedule development

  • Turnaround and outage planning with resource leveling

  • Critical path method (CPM) and float analysis

  • Integration with SAP PM/MM for work order alignment

    Field Execution Support

    • Daily progress tracking and look-ahead planning

    • KPI dashboards in Excel and Power BI

    • Contractor coordination and permit readiness

    • Safety-first sequencing and regulatory compliance

    Tools & Platforms

    • Primavera P6, MS Project, SAP PM/MM

    • Excel, Power BI, Qlik Sense

    • AutoCAD, Bluebeam for drawing-linked planning

Tools & Platforms

  • Primavera P6, MS Project, SAP PM/MM

  • Excel, Power BI, Qlik Sense

  • AutoCAD, Bluebeam for drawing-linked planning

Procurement

Service title

Write a short text about your service. Highlight key benefits for potential clients.

Service title

Write a short text about your service. Highlight key benefits for potential clients.

Service title

Write a short text about your service. Highlight key benefits for potential clients.